Skip to content
Jordan PPP
Stained-glass illustration of robots and an AI tower, the art on the guide’s cover

Governorates

Launch a PPP program for Organizations in Ajloun

A free 17-page guide · The $500 trillion PPP infrastructure opportunity

Share

What this guide is for

Your organization launches a PPP program that turns Ajloun’s forests, heritage and towns into public-private partnerships (PPPs) it can prepare, bid for, build, finance or operate, starting with the tourism, farming and services it already works in.

The case

Ajloun’s organizations can build the place they work in

Ajloun’s largest projects have mostly been decided and financed elsewhere, and most of the governorate’s organizations have watched them from the outside. The projects of the next fifty years will be prepared, built and run by many organizations at once, and the ones that start their own programs now will own a share of the place they work in. This guide invites organizations in Ajloun to launch a PPP program, starting with the projects at home.

The guide

Make Ajloun a green model for the $500 trillion PPP infrastructure opportunity

Your organization opens a dedicated PPP program, a team and a set of offers that take part in Ajloun’s tourism, forestry, farming, water, energy and town projects around its castle, forests and farms, as part of Jordan’s $86 billion of projects.

  1. 01

    An Ajloun PPP team

    A dedicated team that knows how PPPs are prepared, procured and financed follows every project in Ajloun from the first market sounding and decides early where the organization can prepare, bid, build, finance or operate.

  2. 02

    A place in the governorate’s consortia

    Municipalities, nature lodges, farmers, contractors, universities and local investors join the consortia that bid for Ajloun’s projects, bringing the land, the knowledge of the forest and the local workforce that outside partners need.

  3. 03

    Projects around the forest and the castle

    Visitor services at Ajloun Castle and the cable car, nature lodges, forest care, olive processing, water and solar power all depend on each other in Ajloun. An organization that understands those links can shape projects that serve several at once.

  4. 04

    Ajloun-led direct proposals

    Jordan’s PPP Law No. 19 of 2023 accepts direct private proposals under Article 15. An organization in Ajloun can design a project around a need it sees every day, such as an olive press, a cold store for fruit, a visitor shuttle or a rainwater harvesting network, and propose it with partners who finance and build it.

  5. 05

    Pilots as small-scale PPPs

    PPP Regulation No. 9 of 2024 defines small-scale PPPs below $14.1 million, which can be bundled into one feasibility report and one tender. A small concession in Ajloun gives the organization a live asset, a reference and a place in the larger projects that follow.

Page 5 of the guide: The guide
Page 5 of 17 · The guide

Why organizations in Ajloun

Ajloun’s organizations can build the place they work in

Ajloun holds Ajloun Castle, the Ajloun Forest Reserve, a cable car and a growing eco-tourism trade, a short drive from Jerash, Irbid and Amman. Each new project depends on the organizations already working there, and each one can make them partners in what is built.

Where organizations in Ajloun fit in a PPP

Preparation
Local data, land and needs that shape projects the governorate can use and investors can finance.
Tender
Places in consortia beside international developers, contractors and operators.
Financial close
Equity, land contributions and local investors beside the banks and funds.
Operation
Operators, guides, service firms and a workforce that run the asset in Ajloun for decades.
Exit
Stakes that local and national investors can buy, including tokenized notes.

One place, many linked projects

Ajloun Castle, the cable car, the forest reserve, nature lodges and trails, olive and fruit farms, water, roads and the services of its towns all sit within a short drive of each other in Ajloun. A project in one of them changes the demand for the others, which gives organizations that see the whole governorate an advantage in shaping the next one.

Why a program, and why now

The cable car has brought new visitors to Ajloun, and its first tourism and farming projects are taking shape. A program gives an organization in Ajloun a team, a pipeline and partners, and the first organizations to join will help set the standards the rest of the governorate follows.

Page 13 of the guide: Why organizations in Ajloun
Page 13 of 17 · Why organizations in Ajloun
Stained-glass illustration of glowing stepping stones along a glass wall, leading toward a sunrise and a distant city of towers

Futureproofing

Futureproof Organizations in Ajloun for the infrastructure singularity

This free 17-page guide shows how, with small PPPs in parallel, PPP research labs, artificial intelligence, robotics, tokenization and six first steps.

Stained-glass illustration of the Red Sea port of Aqaba at dawn

Jordan and Aqaba

An $86 billion pipeline to start with

Many of them will reach governorates like Ajloun and need local partners to build and run them. An organization that delivers one PPP in Ajloun can carry the same team to the next project across Jordan’s governorates.

$86B
of PPP and infrastructure projects in development in Jordan
$46B
of them anchored in Aqaba
  • Artificial intelligence

    AI fits Ajloun’s forests and farms first. It can spot fire risk and tree disease from drone images, forecast olive and fruit harvests and plan visitor flows to the castle, the reserve and the cable car. An organization in Ajloun can bring those tools into every concession it joins and use the same data to find the next project worth proposing.

  • Robotics

    Forests, hills and orchards are hard places to work by hand. Drones can watch the forest for fire and pests, sorting lines and harvest machines can help olive and fruit farmers and inspection robots can keep pipes and roads in shape. The organizations that run them will need Jordanian technicians trained in Ajloun to operate and maintain them.

  • Tokenization

    Tokenization lets the people and companies of Ajloun own a share of the projects around them. An organization can offer tokenized stakes in a nature lodge, an olive press or a solar plant to local and national investors, pay them from the asset’s own revenue and keep the governorate’s savings working at home.

  • Small PPPs and research labs

    Ajloun is small enough to test a new idea quickly and close enough to Jordan’s largest cities to prove it. An organization in Ajloun can host a PPP research lab, run pilots on its own land and assets and publish every result, so the pilots that work in Ajloun become models for the rest of Jordan.

  • Unsolicited proposals

    A direct proposal lets an organization in Ajloun bring a project built around a need it knows better than anyone, from an olive press to a service for visitors to the forest. It can propose the project as its own, protect the ideas behind it and keep the right to match the best offer at tender.

The program

How the program could work

The program can sit inside the organization’s strategy or business development team, with a PPP lead at its center and offers built from what the organization already owns and runs in Ajloun.

PPP team
A small team of business, technical, legal and finance people that covers every PPP in Ajloun from the first market sounding.
Pipeline
A map of Ajloun’s projects by sector and stage, and the ones that fit the organization’s land, assets and skills.
Consortia
Partnerships with developers, contractors, operators and banks bidding for Ajloun’s projects.
Local supply
Services, staff, land and produce the organization can offer every concession in the governorate.
Direct proposals
Projects proposed under Article 15 around needs the organization sees in Ajloun every day.
Pilots
Small-scale PPPs below $14.1 million that build a track record on live assets in Ajloun.
Partners
Agreements with the governorate’s municipalities, public bodies, universities, investors and other organizations in Ajloun.

What the organization gains

The organization gains contracts and revenue that last as long as the concessions it joins, a bigger role in the governorate it already works in and a reference it can carry to every other project in Jordan.

It also gains a voice in how Ajloun grows. The organizations that help prepare, build and run the governorate’s first AI, robotics and tokenized PPPs will shape its forests, farms and towns for the next fifty years.

Page 14 of the guide: The program
Page 14 of 17 · The program
Stained-glass illustration of glowing stepping stones rising toward a sunrise arch

Next steps

How an organization in Ajloun can start

Any organization in Ajloun can take this guide forward. The first steps use the land, assets, people and partners the organization already has.

  1. 01

    Mandate

    Board or management approval for an Ajloun PPP program, with its sectors, its role and its first-year goals.

  2. 02

    Team

    A named program lead, with business, technical, legal and finance people drawn from the organization’s existing teams.

  3. 03

    Pipeline

    A map of Ajloun’s projects by sector and stage, and early meetings with the authorities, municipalities and developers behind them.

  4. 04

    Offer

    The land, assets, services and local workforce the organization can bring to a consortium, packaged into one offer.

  5. 05

    Partners

    Developers, contractors, operators, banks and other organizations in Ajloun ready to bid together.

  6. 06

    Pilot

    A first consortium bid, small concession or direct proposal in Ajloun, taken from idea to submission.

Ajloun has the castle, the forest, the farms and the visitors, and Jordan has a law that lets an organization propose its own. A PPP program puts your organization at the center of how the superintelligent infrastructure future arrives in Ajloun.

The full document

Inside this guide

Seventeen pages and thirteen chapters, from the case for a PPP program to the first steps, written for organizations in Ajloun.

17
pages
13
chapters
3
technologies
6
first steps
  1. Page 3 of the guide: Introduction

    01Introduction

    Why a century of infrastructure needs rebuilding, and the $500 trillion it will take.

    Page 3 of 17

  2. Page 5 of the guide: The guide

    02The guide

    Make Ajloun a green model for the $500 trillion PPP infrastructure opportunity

    Page 5 of 17

  3. Page 6 of the guide: Jordan and Aqaba

    03Jordan and Aqaba

    An $86 billion pipeline to start with

    Page 6 of 17

  4. Page 7 of the guide: Artificial intelligence

    04Artificial intelligence

    How AI designs, structures and runs PPP projects, and what it means for organizations in Ajloun.

    Page 7 of 17

  5. Page 8 of the guide: Robotics

    05Robotics

    How robots build infrastructure and keep it running, and what that means for organizations in Ajloun.

    Page 8 of 17

  6. Page 9 of the guide: Tokenization

    06Tokenization

    How tokenization funds projects from their own revenue, and the role it opens for organizations in Ajloun.

    Page 9 of 17

  7. Page 10 of the guide: Small PPPs in parallel

    07Small PPPs in parallel

    Why many small PPPs teach a country faster than a few large ones.

    Page 10 of 17

  8. Page 11 of the guide: PPP research labs

    08PPP research labs

    A lab in each sector, running ten small PPP projects a year.

    Page 11 of 17

  9. Page 12 of the guide: Unsolicited proposals

    09Unsolicited proposals

    How Jordan’s PPP law accepts direct proposals from private companies.

    Page 12 of 17

  10. Page 13 of the guide: Why organizations in Ajloun

    10Why organizations in Ajloun

    Ajloun’s organizations can build the place they work in

    Page 13 of 17

  11. Page 14 of the guide: The program

    11The program

    The program can sit inside the organization’s strategy or business development team, with a PPP lead at its center and offers built from what the organization already owns and runs in Ajloun.

    Page 14 of 17

  12. Page 15 of the guide: About

    12About

    About Jordan PPP and what it offers.

    Page 15 of 17

  13. Page 16 of the guide: Next steps

    13Next steps

    How an organization in Ajloun can start: six first steps.

    Page 16 of 17

Questions

Questions about the guide for Organizations in Ajloun

What does the guide for Organizations in Ajloun propose?
Your organization launches a PPP program that turns Ajloun’s forests, heritage and towns into public-private partnerships (PPPs) it can prepare, bid for, build, finance or operate, starting with the tourism, farming and services it already works in.
Why should organizations in Ajloun launch a PPP program?
Ajloun’s organizations can build the place they work in. Ajloun holds Ajloun Castle, the Ajloun Forest Reserve, a cable car and a growing eco-tourism trade, a short drive from Jerash, Irbid and Amman. Each new project depends on the organizations already working there, and each one can make them partners in what is built.
Which PPP projects can organizations in Ajloun take part in?
Jordan has about $86 billion of PPP and infrastructure projects in development, $46 billion of them anchored in Aqaba. Many of them will reach governorates like Ajloun and need local partners to build and run them. An organization that delivers one PPP in Ajloun can carry the same team to the next project across Jordan’s governorates.
How can organizations in Ajloun start a PPP program?
Any organization in Ajloun can take this guide forward. The first steps use the land, assets, people and partners the organization already has. The guide sets out six first steps: mandate, team, pipeline, offer, partners and pilot.
What does a PPP program give organizations in Ajloun?
The organization gains contracts and revenue that last as long as the concessions it joins, a bigger role in the governorate it already works in and a reference it can carry to every other project in Jordan.
Is the guide for Organizations in Ajloun free?
Yes. It is free to read on this page and free to download as a 17-page PDF, with the case for a PPP program, Jordan’s pipeline, the role of AI, robotics and tokenization, the program and six first steps.