What this organization guide is for

Your company launches a PPP program to develop industrial parks and shared utilities as public-private partnership (PPP) projects and to supply the modular and prefabricated components that other PPPs are built from.

The case

Manufacturers make the parts every PPP is assembled from

Most infrastructure is still built piece by piece on site, and more of it will now be made in factories and assembled where it stands. The projects of the next fifty years will need precast structures, modules, pipes, cables and panels in large volumes, and the manufacturers that supply them under long-term contracts will grow with the rebuild. This guide invites manufacturing companies in Jordan to launch a PPP program, starting with the projects at home.

The guide

Manufacture the $500 trillion PPP infrastructure opportunity

Your company launches a dedicated PPP program, a team and a set of offers that develop industrial parks and shared utilities as PPPs and supply factory-made components to the projects around them, starting with Jordan’s $86 billion of projects and the $46 billion anchored in Aqaba.

  1. 01

    A PPP manufacturing team

    A dedicated team that knows how PPPs are prepared, procured and financed follows every project in the pipeline from the first market sounding and offers each consortium the materials, components and equipment it needs under long-term supply contracts.

  2. 02

    Modular and prefabricated components

    Classrooms, clinics, housing, water plants and substations can be assembled from factory-made modules, precast elements and skids. The company designs product lines for PPP projects, so each consortium bids with a faster build, a more certain cost and a known supplier.

  3. 03

    Industrial parks and shared utilities

    Manufacturers in an industrial estate share power, water, wastewater treatment, waste handling and logistics. The company can develop new parks and their shared utilities as PPPs with partners, so each tenant pays one predictable charge for services every plant needs.

  4. 04

    Local supply for the pipeline

    Cement, steel, pipes, cables, glass, equipment and medical supplies all go into PPP projects and the services they run. The company can qualify as a supplier to water, energy, health and transport consortiums and build local content into each bid.

  5. 05

    Small-scale PPPs and direct proposals

    Jordan’s PPP Regulation No. 9 of 2024 defines small-scale PPPs below $14.1 million, which can be bundled into one feasibility report and one tender, and PPP Law No. 19 of 2023 accepts direct private proposals under Article 15. Your company can propose modular classrooms, clinics or water units for public use and bundle them into one tender.

Page 5 of the organization guide: The guide
Page 5 of 18 · The guide

Why manufacturing companies

Manufacturers make the parts every PPP is assembled from

A PPP is a long chain of products, from cement, steel, pipes and cables to pumps, panels, equipment and medical supplies, delivered on schedule and maintained for decades. Manufacturers already make many of these products in Jordan, and more of each project’s value will be made in factories as modular construction grows.

Where manufacturers fit in a PPP

Supply
Cement, steel, pipes, cables, glass and equipment under long-term contracts with the consortium’s contractor and operator.
Modules
Precast structures, modular buildings and prefabricated plant skids that shorten the build and fix its cost.
Industrial parks
Estates and zones with shared power, water, wastewater and logistics, developed and run as PPPs.
Operations
Spare parts, consumables, medical supplies and food that keep hospitals, water plants and transport running.
Local content
Products made in Jordan that keep more of each project’s value in the country and secure its supply chain.

What changes for manufacturers

AI, robotics and tokenization change what a factory can offer a PPP. AI turns a project’s requirements into designs a production line can make, robotic lines produce modules and precast elements to the same standard every time, and tokenized stakes let investors own part of the industrial parks and shared utilities that manufacturers depend on.

Why a program, and why now

A manufacturer that waits for a contractor’s purchase order competes on price for one delivery at a time. A program lets your company design products for PPP projects, join consortiums as their supply partner and develop the parks and utilities it needs as projects of its own. Jordan’s pipeline is large and early, and the manufacturers that join those consortiums now will supply them for decades.

Page 13 of the organization guide: Why manufacturing companies
Page 13 of 18 · Why manufacturing companies
Stained-glass illustration of glowing stepping stones along a glass wall, leading toward a sunrise and a distant city of towers

Futureproofing

Futureproof Manufacturing Companies in Jordan for the infrastructure singularity

This free 18-page guide shows how, with small PPPs in parallel, PPP research labs, artificial intelligence, robotics, tokenization and six first steps.

Stained-glass illustration of the Red Sea port of Aqaba at dawn

Jordan and Aqaba

An $86 billion pipeline to start with

Every one of them will need materials, components and equipment, and many can be built faster from factory-made parts. A Jordanian manufacturer that supplies one project at home can carry the same product line to the next one across the region.

$86B
of PPP and infrastructure projects in development in Jordan
$46B
of them anchored in Aqaba
  • Artificial intelligence

    AI lets a manufacturer design, price and make its products for each project. Generative design turns a project’s requirements into components a factory can produce, models plan production against each project’s schedule, and vision systems check quality on the line. A small team can also read a tender and its specifications and price a supply offer in days.

  • Robotics

    Robotics lets a factory produce components for many projects at once. Robotic welding, cutting, casting and assembly turn out modules and precast elements to the same standard every time, and automated warehouses send them to site in the order they will be installed. A manufacturer that makes modules this way shortens the build on every PPP it supplies.

  • Tokenization

    An industrial park earns rent and utility charges from its tenants for decades, and that revenue can be shared with many investors. A manufacturer can offer tokenized stakes in the parks and shared utilities it develops, pay holders from tenant charges as they arrive and record each component’s origin and test results on a ledger that contractors and lenders can check.

  • Small PPPs and research labs

    Small PPPs suit factory-made infrastructure well, because a modular clinic, classroom or water unit can be built quickly and measured from the first day. A manufacturer can supply lab pilots across many sites at once, test new materials and production methods on live assets and carry the best designs into its product lines for large projects.

  • Unsolicited proposals

    A manufacturer knows what its factories can produce faster and at lower cost than a building site. A direct proposal lets it turn that knowledge into a project of its own design, such as modular clinics for remote towns or shared utilities for an industrial estate, and keep the right to match the best offer if the project goes to tender.

The program

How the program could work

The program can sit inside the company’s commercial and engineering teams, with a PPP lead at its center and the factories, products and customers the company already has behind it.

PPP team
A small team of commercial, engineering, finance and legal people that covers every PPP in Jordan’s pipeline from the first market sounding.
Product lines
Modular buildings, precast elements, plant skids and standard components designed for PPP projects and priced for whole-life contracts.
Supply contracts
Long-term supply, spare parts and maintenance offers for the contractors and operators of water, energy, health and transport PPPs.
Industrial parks
New parks and shared utilities for power, water, wastewater and logistics, developed as PPPs with partners.
Direct proposals
Projects brought to government under Article 15, including small-scale PPPs below $14.1 million.
Technology
Generative design, robotic production, quality inspection and traceability built into every product line.
Partners
Standing agreements with contractors, developers, operators, banks and infrastructure funds that complete each consortium.

What the company gains

The company gains long-term supply contracts with project companies and their operators, steady demand for its factories and, through its parks, equity in assets that earn from every tenant. Each project it supplies becomes a reference for lenders and contractors and a route into the next consortium, in Jordan and across the region.

It also gains a position in how infrastructure will be built next. The first manufacturer in the region to supply PPPs with modules designed by AI and produced by robots will set the cost and schedule that later projects are priced against.

Page 14 of the organization guide: The program
Page 14 of 18 · The program
Stained-glass illustration of glowing stepping stones rising toward a sunrise arch

Next steps

How a manufacturing company can start

Any manufacturing company in Jordan can take this guide forward. The first steps use the factories, products and customers the company already has.

  1. 01

    Mandate

    Board approval for a PPP manufacturing program, with its product lines, the investment it can commit and its first-year goals.

  2. 02

    Team

    A named program lead, with commercial, engineering, finance and legal people drawn from the company’s existing teams.

  3. 03

    Pipeline

    A map of Jordan’s $86 billion of projects by sector and stage, and early meetings with the contractors, operators and contracting authorities whose projects will need its products.

  4. 04

    Products

    Modules, components and supply offers packaged for PPP consortiums and priced for whole-life contracts.

  5. 05

    Partners

    Contractors, developers, lenders, infrastructure funds and technology companies to complete each consortium.

  6. 06

    Pilot

    A first modular project or shared utility as a small-scale PPP or direct proposal, taken from idea to submission.

Jordan has the projects, industrial estates, a port in Aqaba and a law that lets a company propose its own projects. A PPP program puts your company’s products inside the assets of the superintelligent infrastructure future from their first day of construction.

The full document

Inside this guide

Eighteen pages and fourteen chapters, from the case for a PPP program to the first steps, written for manufacturing companies in Jordan.

18
pages
14
chapters
3
technologies
6
first steps
  1. Page 3 of the guide: Introduction

    01Introduction

    Why a century of infrastructure needs rebuilding, and the $500 trillion it will take.

    Page 3 of 18

  2. Page 5 of the guide: The guide

    02The guide

    Manufacture the $500 trillion PPP infrastructure opportunity

    Page 5 of 18

  3. Page 6 of the guide: Jordan and Aqaba

    03Jordan and Aqaba

    An $86 billion pipeline to start with

    Page 6 of 18

  4. Page 7 of the guide: Sector guides

    04Sector guides

    The sectors closest to manufacturing companies, each with its own guide.

    Page 7 of 18

  5. Page 8 of the guide: Artificial intelligence

    05Artificial intelligence

    How AI designs, structures and runs PPP projects, and what it means for manufacturing companies.

    Page 8 of 18

  6. Page 9 of the guide: Robotics

    06Robotics

    How robots build infrastructure and keep it running, and what that means for manufacturing companies.

    Page 9 of 18

  7. Page 10 of the guide: Tokenization

    07Tokenization

    How tokenization funds projects from their own revenue, and the role it opens for manufacturing companies.

    Page 10 of 18

  8. Page 11 of the guide: Small PPPs in parallel

    08Small PPPs in parallel

    Why many small PPPs teach a country faster than a few large ones.

    Page 11 of 18

  9. Page 12 of the guide: PPP research labs

    09PPP research labs

    A lab in each sector, running ten small PPP projects a year.

    Page 12 of 18

  10. Page 13 of the guide: Unsolicited proposals

    10Unsolicited proposals

    How Jordan’s PPP law accepts direct proposals from private companies.

    Page 13 of 18

  11. Page 14 of the guide: Why manufacturing companies

    11Why manufacturing companies

    Manufacturers make the parts every PPP is assembled from

    Page 14 of 18

  12. Page 15 of the guide: The program

    12The program

    The program can sit inside the company’s commercial and engineering teams, with a PPP lead at its center and the factories, products and customers the company already has behind it.

    Page 15 of 18

  13. Page 16 of the guide: About

    13About

    About Jordan PPP and what it offers.

    Page 16 of 18

  14. Page 17 of the guide: Next steps

    14Next steps

    How a manufacturing company can start: six first steps.

    Page 17 of 18

Questions

Questions about the organization guide for Manufacturing Companies in Jordan

What does the organization guide for Manufacturing Companies in Jordan propose?
Your company launches a PPP program to develop industrial parks and shared utilities as public-private partnership (PPP) projects and to supply the modular and prefabricated components that other PPPs are built from.
Why should manufacturing companies in Jordan launch a PPP program?
Manufacturers make the parts every PPP is assembled from. A PPP is a long chain of products, from cement, steel, pipes and cables to pumps, panels, equipment and medical supplies, delivered on schedule and maintained for decades. Manufacturers already make many of these products in Jordan, and more of each project’s value will be made in factories as modular construction grows.
Which PPP projects can manufacturing companies in Jordan take part in?
Jordan has about $86 billion of PPP and infrastructure projects in development, $46 billion of them anchored in Aqaba. Every one of them will need materials, components and equipment, and many can be built faster from factory-made parts. A Jordanian manufacturer that supplies one project at home can carry the same product line to the next one across the region.
How can manufacturing companies in Jordan start a PPP program?
Any manufacturing company in Jordan can take this guide forward. The first steps use the factories, products and customers the company already has. The organization guide sets out six first steps: mandate, team, pipeline, products, partners and pilot.
What does a PPP program give manufacturing companies in Jordan?
The company gains long-term supply contracts with project companies and their operators, steady demand for its factories and, through its parks, equity in assets that earn from every tenant. Each project it supplies becomes a reference for lenders and contractors and a route into the next consortium, in Jordan and across the region.
Is the organization guide for Manufacturing Companies in Jordan free?
Yes. It is free to read on this page and free to download as an 18-page PDF, with the case for a PPP program, Jordan’s pipeline, the role of AI, robotics and tokenization, the program and six first steps.
Stained-glass view from inside a warm room: snow falling past a tall window over a glowing city, a fireplace, a small tree and wrapped gifts

Gifts

Send this guide as a gift

Know someone who should read PPP Program Guide for Manufacturing Companies? Send it to their email with your name on it. It is free, and they have no form to fill in.

Send this guide as a gift

New guide

The golden age of PPPs in Jordan

All 23 sector guides and all 96 organization guides in one free guide to Jordan’s $86 billion.

Cover of The Golden Age of PPPs in Jordan
Stained-glass illustration of the Red Sea port of Aqaba at dawn, seen through an arched window

Presentations

Book a Jordan PPP presentation for your organization

We give it online worldwide, or in person in Jordan, on the days and at the times that suit your team.

Book a presentation