A PPP construction bank for Jordan

Jordan’s savings, projects and pensions are all in dinars, and one bank in the middle could connect them and speed up every PPP.

By Saad I. Sahawneh

Share

A PPP construction bank is a Jordanian bank with one job: lending the country’s own long-term savings, in dinars, to the public-private partnership projects that Jordan and Aqaba are building. It would accelerate Jordan’s PPPs by giving each of the $86 billion of projects, $46 billion of them anchored in Aqaba, a lender at home that is ready from the first tender, lends in the currency the project earns and recycles its capital into the next project.

Every PPP reaches a day called financial close, when the contract is signed and the lenders commit the money. Debt carries most of the capital in a typical PPP, and for Jordan’s largest projects much of it comes from abroad. The US$5.8 billion Aqaba-Amman water projectDownload the guide has the EBRD as its largest lender, and Housing Bank leads a local bank syndicate, which shows that Jordanian money can carry a share of the country’s biggest PPP. A construction bank would make that the normal way to build.

$86B

of PPP and infrastructure projects in Jordan, $46 billion of them anchored in Aqaba

What is a PPP construction bank?

A PPP construction bank is a specialized Jordanian lender that sits between the country’s long-term savers and its PPP projects. A pension fund lends to the bank for the long term in dinars, and the bank lends in dinars to water, energy, transport, school and hospital projects across Jordan and Aqaba, carrying the credit risk itself.

Its owners would be Jordanian banks, institutional investors and the state, and their equity takes the first losses if a loan goes bad. The savers lend to a well-capitalized bank and the bank lends to the projects, so pension money stays one step removed from any single road or pipe. The bank would offer construction and long-term loans, bid bonds and guarantees, finance for the Jordanian contractors that build each asset, and refinancing once an asset is earning. The PPP construction bank page sets out how it would work, step by step.

Why does Jordan need a construction bank for its PPPs?

Jordan needs a construction bank because its PPP projects earn in dinars while much of their long-term debt comes from abroad in dollars. Tolls, tariffs and availability payments are paid in dinars, and Jordan’s commercial banks fund themselves with short-term deposits, so 20 to 25 years of lending to a single project sits awkwardly on their books.

That gap has three costs. The first is currency: a project that earns dinars and repays dollars carries a mismatch for decades, and long dinar hedges are scarce and expensive. Turkey, Argentina, Indonesia and Sri Lanka each financed projects at home with foreign currency debt and paid heavily when their currencies moved. The second is the rate, because dollar loans are priced off interest rates set in the United States. The third is the guarantee: when a foreign loan arrives with a government guarantee, the state keeps the risk while the interest leaves the country.

Where is the money to fund Jordan’s PPPs?

Much of the money to fund Jordan’s PPPs is already in Jordan, in dinars. The Social Security Investment Fund, which invests the savings of Jordan’s workers, reported total assets of about JD20.1 billion at the end of September 2026, in figures published on October 10, 2026.

JD20.1B

held by Jordan’s Social Security Investment Fund at the end of September 2026

Most of it sits in bonds. Bonds made up 56.2% of the fund’s assets and loans 2.4%. The fund lends to the government by buying its bonds, while the projects the government wants built borrow abroad in dollars. A 25-year dinar loan to a water or transport project matches the fund’s long dinar obligations, and it keeps the interest at home as income for Jordan’s retirees.

In Jordan, dinar savings matched to dinar projects can take currency risk off the table, and proposals give the fund a way to shape those projects from the start.

Savings and projects in the same currency need one institution to connect them. The sovereign wealth and pension funds guideDownload the guide shows how a fund in Jordan can launch a long-term PPP allocation, and a construction bank gives that allocation a lender built for the pipeline.

Stained-glass towers in red and violet rising beside still water at sunset
Jordan’s long-term savings can build the projects that serve the people who saved them.

Has Jordan already started funding its own PPPs?

Yes. Jordan’s pension savings are already entering its PPPs, one deal at a time. The Social Security Investment Fund holds a 7% stake in the company behind the Aqaba, Shidiya and Ma’an railway, its first investment in rail, and the Cabinet has approved a 20% stake for the fund in the IPP7 combined-cycle power plant in Mafraq.

On the Aqaba-Amman water project, a company owned by the Social Security Corporation was set up to acquire a 15% stake in the project company, and the fund is finalizing its share of the loans through a consortium of Jordanian commercial banks. Through Daman Leasing, the fund has also financed the Tafileh Government Hospital, the Amman-Zarqa Bus Rapid Transit and the New Amman Customs Center.

Each of these deals was assembled on its own, with its own team, terms and approvals. A construction bank would turn these first steps into a standing program, so the second project is easier than the first and the tenth is routine.

How would a construction bank speed up Jordan’s PPPs?

A construction bank would speed up Jordan’s PPPs by clearing the finance delays that hold projects back before financial close. It would be in the room from the first tender, lend in the currency each project earns, use the same documents on every deal and recycle its capital into new projects across Jordan and Aqaba.

  1. 01A lender from day one: early term sheets show a contracting authority that a bid can be financed, and the lenders in the room when consortiums form are the ones who finance them.
  2. 02Dinar loans for dinar revenues: a loan in the currency of the tolls, tariffs and availability payments takes currency risk out of the deal.
  3. 03One credit team: standard documents and one credit approach make each new loan faster and cheaper than the last.
  4. 04Small PPPs in volume: PPP Regulation No. 9 of 2024 lets small-scale PPPs below $14.1 million be bundled into one tender, and standard terms let the bank lend to many of them.
  5. 05Backing for direct proposals: a proposer under Article 15 of PPP Law No. 19 of 2023 with a dinar lender behind it presents a stronger unsolicited proposal.
  6. 06Lending on live data: sensors and digital twins let the bank test covenants on live data and spot problems early.
  7. 07Capital that recycles: once an asset is earning, the bank refinances through dinar bonds, sukuk and tokenized notes, and lends the proceeds to the next construction site.

Jordan already has a base for that last step. It issued its first sovereign local currency sukuk in October 2016, and the financial regulators guideDownload the guide proposes rules for dinar project bonds and sukuk and a sandbox for tokenized PPP notes. Tokenization lets Jordanian savers own small digital shares of the projects their savings helped build.

What would a construction bank mean for Aqaba?

For Aqaba, a construction bank would mean a lender at home for the $46 billion of projects anchored there, from the port and its terminals to the railway, the water project and green ammonia. These assets serve Jordanian homes and businesses for decades, which suits patient savings that also wait for decades.

$46B

of PPP and infrastructure projects anchored in Aqaba

The Aqaba, Shidiya and Ma’an railway, the container terminal expansion, the multipurpose port and the new bulk liquids terminal are all in the Jordan PPP project register. The pension fund’s railway stake shows how Jordanian savings can enter the Aqaba corridor, and a construction bank could add dinar loans beside regional and international partners on the next phases. The Aqaba guideDownload the guide covers them in full.

Is it safe to lend pension savings to PPPs?

Lending pension savings to PPPs in Jordan can be done safely when the structure puts other money in front of the savers. In a construction bank, equity from banks and the state takes the first losses, the pension money sits in a senior position, and the bank starts small and grows with its track record.

A project loan is less liquid than a government bond and carries construction risk, so the bank would favor availability-based contracts and cap its exposure to any one sector or project. Other countries already build this way. A Canadian pension fund built Montreal’s new light rail line, Malaysia’s national pension fund owns about half of the country’s largest toll road company, and Chilean pension savings fund highways in the local currency. National infrastructure banks such as the Canada Infrastructure Bank, Indonesia’s PT SMI and Brazil’s BNDES were created because commercial banks alone rarely supply 25-year project finance.

How would construction experience make Jordan’s PPPs better and cheaper?

Construction experience would let the bank lend on what a project will really cost and how long it will really take. A construction bank staffed by engineers, cost estimators and project managers who have built in Jordan reads a design, a cost plan and a construction schedule the way a credit officer reads a balance sheet. Most lenders hire an outside technical adviser for each deal and lose that knowledge when the deal closes, while a construction bank keeps it in house and carries it from one project to the next across Jordan and Aqaba.

Construction is where most of a PPP’s risk sits before the asset earns its first dinar. A lender that knows what a pumping station, a school or a stretch of road should cost can tell a sound bid from one priced too low to finish, and it can price the risk on evidence. Well-prepared projects then borrow on better terms, because the bank carries a smaller margin for the unknowns.

Experience also makes the projects themselves cheaper. The bank can ask for value engineering while the design is still open, reuse proven designs across a bundle so the tenth school costs less than the first, and favor designs that cost less to run over the life of the concession, since it is repaid from 25 years of operation. On site, its engineers release each loan draw against work verified in the field, spot delays and overruns early and help the Jordanian contractorsDownload the guide and engineering firmsDownload the guide fix them before they threaten the loan. Every dinar saved in construction means a smaller loan, a lower availability payment for the government and a lower tariff for the people who use the asset.

How would AI, robotics and tokenization help a construction bank?

AI, robotics and tokenization would let a construction bank apply its building knowledge to every loan at once. AI reads and tests each project, robotics builds it and confirms the work, and tokenization finances it and records who owns and is owed what.

  1. 01AI that learns from every project: models test each cost plan, schedule and financial model against the bank’s record of past Jordanian projects, compare bids on whole-life cost and read a concession agreement and its schedules in hours, so each new loan is priced on more evidence than the last.
  2. 02Drones that confirm progress: drones map the site and measure the work done, so a construction draw is released when a flight confirms the work and problems reach the credit team early.
  3. 03Finance for robots on site: the bank can lend Jordanian contractors the construction robots, modular factories and autonomous machines that build with smaller crews, because projects built with automated construction finish closer to schedule and assets maintained by robots fail less often.
  4. 04Tokenized loans and payments: a construction loan can be split into small tokenized notes held by Jordanian savers and institutions, and a public registry records every milestone, draw and repayment, so a payment moves when a machine confirms the work.

Each project then adds data that sharpens the next estimate and the next loan. A bank that pairs the judgment of people who build with these tools can lend faster and lose less, and it can pass those savings to the projects it finances in Jordan and Aqaba.

How could Jordan launch a PPP construction bank?

Jordan could launch a PPP construction bank in four steps: a small team designs the bank and its rules, Jordanian banks and the state provide its first-loss equity, a pension fund commits its first long-term dinar funding, and a single pilot proves the model from credit approval to repayment.

A natural pilot is a bundle of new public schools under availability-based contracts, or a dinar loan beside the next phase of the Aqaba corridor. When the first schools open on time, the bank moves on to the next projects. The free guides for banksDownload the guide, development finance institutionsDownload the guide and credit guarantee institutionsDownload the guide show how each can launch its own PPP program.

The savings, the projects and the pensions are all in dinars and all in Jordan. A construction bank connects them, so Jordan can fund Jordan, build its $86 billion of projects faster and keep the returns with the Jordanians whose savings made them possible.