Jordan’s savings, building Jordan

PPP construction bank

The PPP construction bank is a Jordanian bank with one job: lending the country’s own long-term savings, in dinars, to the public-private partnership projects that Jordan and Aqaba are building. People who know how projects are built decide every loan, and AI, robotics and tokenization help them build better, faster and for less.

Share
$86B
of PPP and infrastructure projects in development in Jordan
$46B
of them anchored in Aqaba
JD20.1B
held by the Social Security Investment Fund at the end of September 2026
2.4%
of the fund’s assets in loans, beside 56.2% in bonds

Why Jordan needs it

Projects earn dinars while much of their debt comes in dollars

Tolls, tariffs and availability payments are paid in dinars, while much of the long-term debt for Jordan’s largest PPPs comes from abroad. Jordan’s commercial banks fund themselves with short-term deposits, so 20 to 25 years of lending to a single project sits awkwardly on their books. That gap has three costs.

  1. 01

    Currency

    A project that earns dinars and repays dollars carries a mismatch for decades, and long dinar hedges are scarce and expensive. Turkey, Argentina, Indonesia and Sri Lanka each financed projects at home with foreign currency debt and paid heavily when their currencies moved.

  2. 02

    The rate

    Dollar loans are priced off interest rates set in the United States, so the cost of a Jordanian road or pipeline moves with decisions made far from Jordan.

  3. 03

    The guarantee

    When a foreign loan arrives with a government guarantee, the state keeps the risk while the interest leaves the country.

How it works

One bank in the middle connects savings and projects

The savers lend to a well-capitalized bank and the bank lends to the projects, so pension money stays one step removed from any single road or pipe.

  1. 01

    Savers lend to the bank

    A pension fund lends the bank long-term money in dinars, matched to its own long dinar obligations to Jordan’s retirees.

  2. 02

    Owners take the first loss

    Jordanian banks, institutional investors and the state own the bank, and their equity takes the first losses if a loan goes bad.

  3. 03

    The bank lends to projects

    It lends in dinars to water, energy, transport, school and hospital PPPs across Jordan and Aqaba, and carries the credit risk itself.

  4. 04

    Capital recycles

    Once an asset is earning, the bank refinances through dinar bonds, sukuk and tokenized notes and lends the proceeds to the next construction site.

What the bank offers

  • Construction loans and long-term loans in dinars
  • Bid bonds and guarantees
  • Finance for the Jordanian contractors that build each asset
  • Refinancing once an asset is earning
Stained-glass building rising under cranes beside a concrete mixer truck at sunset

Built by people who build

Construction experience makes every project better and cheaper

Construction is where most of a PPP’s risk sits before the asset earns its first dinar. Most lenders hire an outside technical adviser for each deal and lose that knowledge when the deal closes. The PPP construction bank keeps it in house.

  • It reads the engineering

    Engineers, cost estimators and project managers who have built in Jordan read a design, a cost plan and a construction schedule the way a credit officer reads a balance sheet. The bank keeps that knowledge in house and carries it from one project to the next.

  • It prices risk on evidence

    A lender that knows what a pumping station, a school or a stretch of road should cost can tell a sound bid from one priced too low to finish. Well-prepared projects borrow on better terms, because the bank carries a smaller margin for the unknowns.

  • It designs out cost

    The bank asks for value engineering while the design is still open and reuses proven designs across a bundle, so the tenth school costs less than the first. It is repaid from 25 years of operation, so it favors designs that cost less to run.

  • It pays for verified work

    Its engineers release each loan draw against work verified in the field, spot delays and overruns early and help the contractor fix them before they threaten the loan.

Every dinar saved in construction means a smaller loan, a lower availability payment for the government and a lower tariff for the people who use the asset.

The guides for contractors and engineering and consulting firms show how the people who build can launch PPP programs of their own.

Stained-glass towers in red and violet rising beside still water at sunset

The money is already here

Jordan’s savings are in dinars, and so are its projects

The Social Security Investment Fund, which invests the savings of Jordan’s workers, reported total assets of about JD20.1 billion at the end of September 2026. Most of it sits in bonds, and a 25-year dinar loan to a water or transport project matches the fund’s long dinar obligations and keeps the interest at home as income for retirees.

Jordan has started

Pension savings are entering Jordan’s PPPs, one deal at a time

7%
stake held by the Social Security Investment Fund in the company behind the Aqaba, Shidiya and Ma’an railway, its first investment in rail
20%
stake for the fund in the IPP7 combined-cycle power plant in Mafraq, approved by the Cabinet
15%
of the Aqaba-Amman water project company, to be acquired by a company owned by the Social Security Corporation

Through Daman Leasing, the fund has also financed the Tafileh Government Hospital, the Amman-Zarqa Bus Rapid Transit and the New Amman Customs Center. On the Aqaba-Amman water project, the EBRD is the largest lender, Housing Bank leads a local bank syndicate and the fund is finalizing its share of the loans through a consortium of Jordanian commercial banks.

Each of these deals was assembled on its own, with its own team, terms and approvals. The PPP construction bank would turn these first steps into a standing program, so the second project is easier than the first and the tenth is routine.

Aqaba

of PPP projects anchored in Aqaba, with a lender at home

From the port and its terminals to the railway, the water project and green ammonia, Aqaba’s assets serve Jordanian homes and businesses for decades, which suits patient savings that also wait for decades.

The pension fund’s railway stake shows how Jordanian savings can enter the Aqaba corridor, and the PPP construction bank could add dinar loans beside regional and international partners on the next phases. The Aqaba guide covers the projects in full.

Is it safe?

Other money stands in front of the savers

Equity from banks and the state takes the first losses, the pension money sits in a senior position, and the bank starts small and grows with its track record. A project loan is less liquid than a government bond and carries construction risk, so the bank favors availability-based contracts, caps its exposure to any one sector or project and puts its own engineers on every site.

Other countries already build this way. A Canadian pension fund built Montreal’s new light rail line, Malaysia’s national pension fund owns about half of the country’s largest toll road company, and Chilean pension savings fund highways in the local currency. National infrastructure banks such as the Canada Infrastructure Bank, Indonesia’s PT SMI and Brazil’s BNDES were created because commercial banks alone rarely supply 25-year project finance.

Where it starts

Four steps to a PPP construction bank

  1. 01

    Design

    A small team designs the bank, its rules and its credit approach.

  2. 02

    Capital

    Jordanian banks and the state provide its first-loss equity.

  3. 03

    Funding

    A pension fund commits the first long-term dinar funding.

  4. 04

    Pilot

    One project proves the model from credit approval to repayment, such as a bundle of new public schools under availability-based contracts or a dinar loan beside the next phase of the Aqaba corridor.

The savings, the projects and the pensions are all in dinars and all in Jordan. A PPP construction bank connects them, so Jordan can fund Jordan, build its $86 billion of projects faster and keep the returns with the Jordanians whose savings made them possible.

New guide

The golden age of PPPs in Jordan

All 23 sector guides and all 96 organization guides in one free guide to Jordan’s $86 billion.

Cover of The Golden Age of PPPs in Jordan
Stained-glass illustration of the Red Sea port of Aqaba at dawn, seen through an arched window

Presentations

Book a Jordan PPP presentation for your organization

We give it online worldwide, or in person in Jordan, on the days and at the times that suit your team.

Book a presentation