Skip to content
Jordan PPP
Stained-glass illustration of an observatory dome with its telescope raised, standing on a rocky ridge above the sea at sunset

Fountain of PPP youth

Jordan’s PPP era is young and a hundred years long, and every generation of students, researchers and founders who steps into it keeps it young.

By Saad I. Sahawneh

Share

The future of PPPs in Jordan has only just started, and like the fountain of youth in the old legend, it stays young as long as new people keep flowing into it. Jordan’s public-private partnership (PPP) era will run for a hundred years across $86 billion of projects, $46 billion of them anchored in Aqaba, and its students, researchers and young founders can start careers in PPP today.

What is the fountain of PPP youth?

The fountain of PPP youth is the steady flow of young people into Jordan’s PPP system. In the old legend, a spring keeps whoever drinks from it young. A PPP system has its own spring: each new class of students, researchers and founders who join it and bring the newest tools and ideas with them.

Each generation learns the law, finance and engineering of PPPs from the one before and adds the tools it grew up with. A system that young people keep entering renews its skills with every class, so it can stay young for a century, from the governorates to Aqaba.

Why has the future of PPPs only just started?

The future of PPPs has only just started because Jordan’s PPP system is young and its tools are younger still. Jordan passed its first PPP law in 2014 and its third in 2023, and the AI, robotics and tokenization that will run its projects are arriving now, so the people who join today join near the beginning.

The law grew in three steps. PPP Law No. 31 of 2014 set up a PPP Unit at the Ministry of Finance and a PPP Council chaired by the Prime Minister. Law No. 17 of 2020 replaced it, PPP Law No. 19 of 2023 took effect on November 13, 2023, and PPP Regulation No. 9 of 2024 sets out how a direct proposal is studied. Jordan has passed three PPP laws, each one to make the next projects easier.

The tools are younger than the laws. Artificial intelligence prepares feasibility studies, reads contracts and monitors assets. Robotics brings drones, construction robots and inspection crawlers to build and maintain them. EarthOS, an operating system that learns from each project and shares what it finds, links them together. Each one changes how projects are prepared, built, run and owned.

Why is the work of PPPs a hundred years long?

The work of PPPs is a hundred years long because the world builds and rebuilds its infrastructure one piece at a time, and each PPP runs for decades. A 40-year PPP signed in Jordan in 2026 will still be running in 2066, so the people who will run, repair and hand back today’s projects are still in school.

The last century shows the scale. Over the hundred years from 1926 to 2025 the world built about $140 trillion of infrastructure, and about $60 trillion of it has already worn out. Rebuilding and running the world’s infrastructure will take about $500 trillion over the next fifty years: $300 trillion to build, $150 trillion to operate and maintain, and $50 trillion for the sensors, compute and robotics inside the assets.

$500T

to rebuild and run the world’s infrastructure over the next fifty years, the field today’s students will work in

The people who design the projects of the next fifty years are students today.

Jordan’s own share starts with about $86 billion of PPP and infrastructure projects in development, $46 billion of them anchored in Aqaba. Our look at the future of PPPs follows how the model itself will change over the decades, and the vision page sets out the full $500 trillion picture.

Why do PPPs in Jordan need young people?

PPPs in Jordan need young people because the projects of the next fifty years will be built and run with technologies that are still in the lab today. The people who grow up with AI, robots and digital ownership will use them best, and Jordan’s pipeline, from the governorates to Aqaba, will need them for decades.

Stained-glass illustration of a laboratory with flasks, test tubes and a microscope beside a great arched window over the sea at sunset
The projects of the next fifty years will be built and run with technologies that are still in the lab today, and Jordan’s research centers can test and certify them.

Every PPP needs engineers, lawyers and financiers who understand how a project is prepared, financed and operated, and few degree programs teach all of it together. AI, robotics and tokenization also change what a PPP professional needs to know. An engineer will work beside digital twins and inspection robots, a lawyer will draft clauses for autonomous machines and tokenized notes, and a financier will test models with AI and price projects on live data.

Careers in PPP run through every stage of a project, from preparation and finance to construction, operation and hand-back, and a concession that runs for decades keeps its people at work for decades too. The universities guide says a university with a PPP program gains a field that will employ its graduates for the rest of their careers.

How can students and young founders get into PPPs in Jordan?

Students and young founders can get into PPPs in Jordan through the organizations around them: universities, research centers, schools, training providers, accelerators and venture capital firms. Each one has a free guide on launching a PPP program, and each program opens a door to Jordan’s $86 billion of projects and the $46 billion anchored in Aqaba.

  1. 01Students. Study PPP law, finance and engineering together, follow one real project from first idea to operation, and learn the AI, robotics and tokenization tools the projects run on. Generation PPP sets out the full set of routes for young people.
  2. 02Universities. The universities guideDownload the guide proposes a PPP program with courses, research labs and partnerships with government and industry, with direct proposals prepared as coursework, so every graduating class leaves with projects that Jordan’s public authorities can study.
  3. 03Research centers. The research centers guideDownload the guide proposes a program to research, test and certify the technologies PPP projects run on, and to run PPP research labs, each running ten small PPP projects a year at up to $100,000 each and publishing every result.
  4. 04Schools, education companies and training providers. Classrooms, training centers and digital learning can be built and run as PPPs, as the schoolsDownload the guide, education companiesDownload the guide and vocational trainingDownload the guide guides describe, and the same programs train the welders, electricians, drone pilots and data technicians every project needs.
  5. 05Young founders. Small PPPs below $14.1 million, direct proposals under Article 15 of PPP Law No. 19 of 2023, the PPP infrastructure track in the accelerators guideDownload the guide and seed tickets from venture capital firmsDownload the guide give a startup a legal route and the money for its first pilot.
  6. 06Everyone. Tokenized shares let young people own part of the assets they help build and be paid from each asset’s own revenue.

The small PPPs page and the unsolicited proposals page explain each step for founders. In an accelerator’s PPP track, each startup is matched with a live project, contracting authority or consortium in Jordan’s pipeline, from Amman to Aqaba, so its product is built against a real requirement. A Jordanian startup that wins one project at home can sell to the next one across the region.

Where can young engineers and founders start in Aqaba?

Young engineers, operators and founders can start in Aqaba, where $46 billion of Jordan’s $86 billion of projects are anchored. Aqaba holds Jordan’s only port and its gateway to the Red Sea and a special economic zone, where port terminals, logistics zones, water, power and green hydrogen sit within a few kilometers of each other.

Aqaba is small enough to test a new idea quickly and busy enough to prove it, so the pilots that work in Aqaba can become the models for the rest of Jordan. Its ports and logistics zones are where robots already work at scale, and the Aqaba guideDownload the guide adds that automated cranes, yard vehicles, drones and inspection robots will need Jordanian technicians trained in Aqaba to operate and maintain them.

A young founder in Aqaba can design a project around a need seen every day, such as a cold store at the port, a marina service or a smart parking network, and propose it with partners who finance and build it. A training provider can train the technicians the port and the zone will hire, and a university lab can take its research to a live asset as a pilot.

What can young people and their institutions in Jordan do this year?

The fountain of PPP youth keeps flowing when young people step in, and anyone in Jordan and Aqaba can help it flow this year. A student can pick one project to follow, a university or research center can launch a PPP program, and a young founder can bring a direct proposal under Article 15.

A school or training provider can teach the trades the projects need, and an accelerator or fund can open a PPP track for founders building AI, robotics and tokenization for infrastructure. Each guide ends with the same six first steps: a mandate, a team, a map of the pipeline, its own offer, partners and a first pilot.

The hundred years ahead will rebuild the world’s infrastructure, and Jordan starts with $86 billion of projects, $46 billion of them in Aqaba. The students who start this year will prepare the first of them, the founders will supply their tools, and each new class will step in after them, keeping Jordan’s PPP system as young in its hundredth year as it is today.

Four of the 96 guides, for the organizations that bring Jordan’s students, researchers and founders into PPPs.