PPP ambition unleashed

Jordan has the projects, the laws and the people to build at a far larger scale, and everyone in the country has a part to play.

By Saad I. Sahawneh

Share

PPP ambition unleashed means Jordan building all of its $86 billion of PPP and infrastructure projects at full speed: 247 projects across 23 sectors, with $46 billion of them anchored in Aqaba. It takes political will at the top, agency in every organization and every citizen, and a country that is unafraid to forge its own future.

How big is the PPP opportunity in Jordan?

The PPP opportunity in Jordan is about $86 billion of PPP and infrastructure projects in development, 247 projects across 23 sectors, and $46 billion of them are anchored in Aqaba, Jordan’s only port. Every project on that list needs designers, builders, lenders, operators and partners, and each one is an open door for someone in Jordan.

The projects are already large. The National Water Carrier will desalinate 300 million cubic meters of Red Sea water a year at Aqaba and pump it 450 kilometers to Amman, about 40% of the kingdom’s drinking water. Marsa Zayed is valued at about US$10 billion on the Aqaba waterfront. Amra City is a 25-year plan with room for more than a million people, and it will rely on public-private partnerships. The opportunity page and the sector guides list every one of them.

$86B

of PPP and infrastructure projects in development in Jordan, across 247 projects in 23 sectors

Beyond Jordan, rebuilding and running the world’s infrastructure will take about $500 trillion over the next fifty years. Jordan’s projects are the place where Jordanians can learn to compete for that market, and win a share of it.

Why does Jordan need bold ambition now?

Jordan needs bold ambition now because the world is about to rebuild most of what it has built. The countries that move first will set the methods, train the people and attract the capital that everyone else follows, and Jordan, with $86 billion of projects and a young population, can be one of them.

The usual pace is slow. The World Bank counted 315 private infrastructure projects reaching financial close across all low- and middle-income countries in 2024, only a few per country, and a country that signs a few contracts a year learns slowly. Jordan can set a far faster pace. In Jordan, 1% of the budgets of 40 contracting authorities, about $78 million, would fund 780 small PPPs a year at $100,000 each, as the small PPPs page shows.

Ambition at that pace turns every ministry, city and company into a builder. Small projects run in parallel let a country test many legal structures, financing models and construction methods at once, and the best of them can grow into the large contracts of the next decade.

What has Jordan already proved it can build?

Jordan has already proved it can build big things through partnership. The As-Samra wastewater plant reached financial close in 2003, Airport International Group signed a 25-year concession for Queen Alia International Airport in 2007, and Amman East, the country’s first independent power plant, opened in 2009.

The National Water Carrier raised the scale. A group led by Meridiam and Suez signed the BOT contract on January 12, 2025, and the final agreement followed on April 21, 2026, at about $4.3 billion to build, with water due to flow from 2030 from Aqaba to Amman.

Young Jordanians have reached even further. Jordan’s first satellite, JY1-SAT, was built by young Jordanian engineers and launched on December 3, 2018, and on April 23, 2026, Jordan signed the Artemis Accords. The PPPs on the Moon post shows where that path can lead.

Who has the agency to build Jordan’s future?

Everyone in Jordan has agency in its PPP future. Article 15 of PPP Law No. 19 of 2023 lets any private company take its own PPP idea to the Ministry of Investment or a public authority, and PPP Regulation No. 9 of 2024 makes small-scale PPPs below $14.1 million simpler to tender.

Agency means that nobody has to wait for permission to start. Each kind of organization already has a move it can make this year:

  1. 01A ministry or public authority can name a PPP lead, publish one list of needs and tender a PPP research lab that runs ten small PPP projects a year at up to $100,000 each.
  2. 02A municipality can bundle small projects, from a clinic or a market to a solar plant or a water network, into one feasibility report and one tender, as the municipalities guideDownload the guide describes.
  3. 03A bank can turn small PPPs into a standard product and lend to them many times over, as the banks guideDownload the guide sets out.
  4. 04A contractor or developer can bring its own project to government under Article 15 through the unsolicited proposals route.
  5. 05A university or a student can design and build the pilots, the way young Jordanian engineers built JY1-SAT.
  6. 06A citizen can one day own a tokenized share of the roads, plants and networks the country builds, and earn from what they make.
  7. 07A Jordanian abroad can come home and build, with savings, skills or both.

What does political will look like for PPPs in Jordan?

Political will for PPPs in Jordan looks like one clear national ambition, set at the top and carried by every ministry. The Royal Hashemite Court guideDownload the guide describes a national initiative in step with the Economic Modernisation Vision and its 2033 horizon, with one table for ministries, public authorities, lenders, universities, investors and the companies that bid.

In practice, political will is a set of decisions that only government can make. A government-wide fast track can give small-scale PPPs standard documents and agreed timelines in every ministry. A fast track for direct proposals can rest on one public list of needs across government. Moving 1% of budgets away from inefficient spending, about $78 million a year, would pay for 40 labs and 400 pilots, each with its results published. The Prime Ministry guideDownload the guide shows how the center of government can run it as one program.

A government that prepares, tenders and supervises its PPPs as one program can set a model the region can follow, with each ministry’s results open to the others.

Why must Jordan be unafraid to forge its future?

Jordan can be unafraid to forge its future because the cost of trying is falling fast. The PPP singularity is the point at which it becomes cheaper to build the pilot than to conduct the study, and Jordan can reach it by building hundreds of small pilots a year and publishing every result, including the failures.

Today a single $100 million PPP can spend $10 million on preparation, enough to build 100 pilots at $100,000 each. A pilot that fails at $100,000 teaches the country something real, and a pilot that works can grow up the PPP pyramid into a project worth billions.

Stained-glass illustration of a new city of tall glass towers rising along a curving green avenue toward the sea at sunrise.
Amra City, a 25-year plan with room for more than a million people, will rely on public-private partnerships.

Artificial intelligence, robotics and tokenization make that boldness safer. AI can plan a project in hours, robots can build and inspect with very few people on site, and tokenization can fund small pilots from their own revenue. The vision page shows where those three technologies lead, and Aqaba, small enough to test a new idea quickly, is the natural place to try them first.

Where can you start today?

You can start today in Jordan by opening the free guide written for your organization and taking its six first steps: a mandate, a team, a map of the pipeline, your own offer, partners and a first pilot. Readers in Aqaba can start with the Aqaba guideDownload the guide and the guide for ports and logistics.

All 121 guides are free on the guides page, and a presentation can take your team through Jordan’s $86 billion of projects online or in person. Pick one project from the 247, name one person to lead it and build your first pilot this year.

Free guides for the organizations that can unleash Jordan’s PPP ambition