Jordan can lead the world in PPPs
The world has started rebuilding a century of infrastructure, and the countries that prepare their PPPs early will be ready to build it.
Jordan can lead the world in PPPs if it starts now, because the world has started rebuilding a century of infrastructure and Jordan already has the projects, the law and the people to take an early place in that rebuild. Jordan has $86 billion of PPP and infrastructure projects across 247 projects in 23 sectors, $46 billion of them anchored in Aqaba, and a 40-year PPP signed in Jordan in 2026 will still be running in 2066.
Why is now the moment for Jordan to lead in PPPs?
The world built about $140 trillion of infrastructure over the hundred years from 1926 to 2025, and about $60 trillion of it has already worn out. Jordan, like every country, now faces renewal and new building at the same time, and the countries that prepare their projects first will be first in line for capital, builders and operators.
$60T
of the infrastructure the world built over the last century has already worn out or been retired
That money will go first to the countries with projects ready to tender and a record of closing deals. Jordan has that record. The As-Samra wastewater plant reached financial close in 2003 and Amman East, the country’s first independent power plant, opened in 2009. The opportunity page lists the projects that come next.
What does waiting cost Jordan?
Waiting keeps Jordan preparing each project as a one-off, where the lessons from one rarely reach the next. The World Bank counted 315 private infrastructure projects reaching financial close across all low and middle income countries in 2024, only a few per country, and a country that signs a few contracts a year learns slowly.
The needs keep growing while the projects wait. Jordan is one of the most water-scarce countries in the world, and every city, farm and factory depends on water that is pumped, treated and delivered across the country.
Small PPPs change the pace. In Jordan, 1% of the budgets of 40 contracting authorities, about $78 million, would fund 780 small PPPs a year at $100,000 each, so the country can learn from hundreds of pilots a year alongside its large contracts.
Which deadlines has Jordan already set?
Jordan has already set its own clock. The Economic Modernisation Vision looks toward 2033, the 2025 to 2035 energy strategy targets commercial green hydrogen production by 2030, and the Baptism Site is being prepared for the 2030 bimillennial. Each target needs projects tendered, financed and built in the years before it.
- 012030: first water from the Aqaba-Amman water project is due by the end of the year.
- 022030: commercial green hydrogen production starts, as the energy strategy targets, and the hydrogen sector guide expects the first green ammonia plants to ship from Aqaba.
- 032030: the Baptism bimillennial brings pilgrims from around the world, and about 1,400 dunums next to the Baptism Site are prepared for Bethany Village, as the tourism sector guide records.
- 042030: the Risha gas field targets about 418 million cubic feet a day, rising to 810 million by 2035.
- 052033: the horizon of the Economic Modernisation Vision.
- 062035: about 500,000 tonnes of green hydrogen a year in the approved national energy strategy.
- 072066: a 40-year PPP signed in 2026 is still running.
Every date on that list depends on PPPs that a contracting authority has to prepare, tender and finance first, so the work for 2030 and 2033 starts with the projects prepared today.

Why does going first matter for Jordan?
Going first lets Jordan learn early and share what works. Jordan’s mining companies guideDownload the guide gives an example, since the first mining company in the region to pair its mines with shared rail, port, water and power PPPs, run with AI and autonomous machines, will give the projects that follow a proven model to build on.
Jordan has a pipeline of projects, a PPP law that accepts direct proposals and a generation of young engineers and founders who can build the tools these projects need.
The same holds in every sector. The development finance institutions guideDownload the guide notes that institutions that open a dedicated window now will shape how the rebuild is prepared and financed in the countries that need it most.
Timing also decides which technologies a project is built for. A 40-year PPP signed in Jordan in 2026 will still be running in 2066, so every project tendered now will be run, repaired and handed back in a world where AI, robotics and tokenization are mature, and the futureproofing page shows how to plan for that from the first tender. The people who design the projects of the next fifty years are students today.
What hardware and software does Jordan need to lead?
To lead the world in PPPs, Jordan needs the hardware and software inside its projects as well as the projects themselves. The hardware is the sensors, robots, chips, cables and pipes that build and watch each asset. The software is the AI that designs and runs them, and tokenization manages the money and the ownership.
Hardware. Much of it already works in Jordan. Smart meter installation for electricity reached 96% by the end of 2025, the Greater Amman Municipality watches the capital’s roads with about 5,600 cameras, and the National Water Carrier will watch its whole pipeline for leaks with fiber optic sensing, in a country that still loses 41% of its water. The sensors page explains what each kind of sensor measures.
Jordan can make much of that hardware too. A spiral steel pipe and coating plant at Quweira in Aqaba, approved by the Cabinet in August 2026, will send half of its output to the National Water Carrier and employ about 420 people. In 2026 the Ministry of Investment offered investors plants for chip packaging, circuit boards, batteries and drone components.
Software. Jordan arrives late to PPP software with few legacy systems to replace, and the AI companies that join its projects now will help shape the data standards for the projects that follow. EarthOS describes the shared AI software that runs on top of the sensors, and young Jordanian engineers and founders can design the software, run the robots and structure the finance for these projects, so the skills and companies stay in Jordan and serve the wider region.
Compute. Aqaba Digital Hub, Jordan’s largest carrier-neutral data center, lands subsea cables that link the country to Asia, Africa and Europe and is adding a second hall with EBRD and EU support. Every concession that uses AI to plan, operate and maintain its assets will need compute close to the asset and models that keep sensitive data inside Jordan, as the Digital and AI sector guide explains.
What does the Aqaba-Amman water project show the world?
The Aqaba-Amman Water Desalination and Conveyance Project shows that Jordan can close the largest PPPs in the world. On November 19, 2026, the Minister of Water and Irrigation and Meridiam’s chief executive signed a US$6.6 billion agreement to launch the works, and the same day the Deputy Prime Minister said the project had reached financial close.
$6.6B
total value at financial close of the Aqaba-Amman water project, the world’s largest PPP of 2026
The project, also called the National Water Carrier, will take water from the Red Sea at Aqaba, turn it into drinking water and pump it about 417 km north to Amman. It is to supply 300 million cubic meters a year, which the government says is about 40% of Jordan’s drinking water needs, and first water is due by the end of 2030.
The deal also shows who can take part. Meridiam owns 75% of the project company, the Social Security Investment Fund 15% and SUEZ 10%, and Jordanian banks led by Housing Bank lend beside international development banks and funds. The Aqaba-Amman project guide follows the deal, the money and everyone involved.
Why does Aqaba need to move first?
Aqaba holds $46 billion of Jordan’s PPP and infrastructure projects, and they depend on each other. Port terminals, dry ports and logistics zones, rail freight, fuel and bulk mineral terminals, green hydrogen and ammonia, water, resorts and the utilities of the economic zones all sit within a few kilometers of each other in Aqaba.
$46B
of PPP and infrastructure projects anchored in Aqaba
Because the projects are linked, the order matters. Aqaba’s $46 billion includes the North Business District, Al Doum housing and waterfront districts that will house the workers of its port, industry and tourism, and those homes need to be ready when the plants and terminals open. The Aqaba guideDownload the guide and the economic zones guideDownload the guide show how one program can prepare them together.
How can organizations in Jordan start now?
Organizations in Jordan can start now under rules already in force. Article 15 of PPP Law No. 19 of 2023 lets a private company bring its own PPP idea to government, and small-scale PPPs below $14.1 million can be bundled into one feasibility report and one tender under simpler procedures.
A ministry can publish one list of needs, a municipality can bundle its small projects, a bank can lend to them, a university can run the pilots and a founder can bring a direct proposal. Each of the 96 free organization guides shows one kind of organization how to launch its own PPP program.
Starting now leaves time for several rounds of pilots before 2033, the horizon of the Economic Modernisation Vision, and for the best results to reach the large projects in the pipeline. The vision shows where those projects lead, from Amman to Aqaba.